Tuesday, 17 May 2011
Building the set
In todays lesson Myself, Chelsea and Ellen sat down and built the set for my stop frame animation. The actual set consists of twelve different buildings and twelve different extras. Some of the extras that will be in my scene will be static and others will be moving. the set took around a hour and half to fully complete. i feel that the actuall building and teamwork on this part of the project was great, the whole thing ran smoothly and theres was minimul hiccups. when building the set we had to think of where we could put the camera in so it would be possible to shoot.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment